PAGE 752 DRAGLINE S/N 378

Offered “as is, site location central Florida”.
In good condition. Dragline is commissioned, refurbished, and upgraded.
- Refurbished operator’s cabin
- Auger cleaning facility under drag drum and ropeway
- Bulk lubrication tank with external filling facility
- 15-ton overhead crane with two hoist units
- Modified lower swivel on fairlead frames
- New lower bearing on each swing shaft
- Armature cabling upgraded to 500 MCM armoured cable
- New control wiring installed
- Overhauled master controls
- Mast and boom corroded or bent lacings replaced, blasted, re-coated
- New center pin bushing installed
- New foot pins installed in boom to revolving frame connection
- MG sets and DC motors overhauled by Flanders Electric
- Six new intake fan motors installed
- New General Electric control cabinet installed
- HV cabinet rebuilt
- New boom raise/lower rope installed
- New drag gear and pinions installed

Machine Specification
Original build completed September 1977
Major rebuild 1996 included new tub, rack, rails & rollers
Decommissioned September 2005 due to cessation of mining in that area
Boom Length |
Boom Angle |
Dig Depth |
Drum Dia. |
No of Drag ropes |
No of Hoist ropes |
Bucket Cap. |
225 Ft |
30 degrees |
140 Ft |
74 .75” |
2 |
2 |
42 C/Yds Can go to 45 C/Yds |
General Electrics System Installed
4 |
Swing Motors |
814 |
375 Hp |
2 |
Hoist Motors |
824 |
1345Hp |
2 |
Drag |
824 |
1345Hp |
1 |
Propel |
824 |
1345Hp |
1 |
MG set Hst & drag |
Model
5T8860761A1 |
2250 Hp |
1 |
MG set Swing |
Model
5K830856A3 |
800 Hp |
Brief on Machine Condition

Electrics
All electrical components as detailed have been overhauled at Flanders Electric workshop in Lakeland Florida
- MG sets
- Exciter
- Drag, hoist, propel and swing motors
- Drag, hoist, & swing controllers overhauled and upgraded
All cabling replaced. Armature cabling upgraded to 500MCM cable.
Control cabling replaced with upgraded armoured cable.
PCR cabinets overhauled and a new GE control cabinet installed
New insulators and trail cable terminals installed in tub.
On-board transformers overhauled and tested.

Mechanical
New lower swing bearings installed on each of the four shafts
Swing shafts ultra-sonic tested for cracks and found to be in good condition
Bulk lubrication tanks installed with external recharge facility.
All upper, lower and intermediate suspension ropes in good condition with no evidence of broken wires or deformation in the ropes
Boom and mast structure in good condition with no damaged or cracked lacings
Mast boom and A-frame blasted and recoated
Revolving frame blasted, tested for cracking, and recoated
New bolts installed front and back machinery frames
Operator’s cabin clean & tidy, with new floor and floor covering installed

Summary
This machine is in good condition.
It represents excellent value, with Page dragline world-wide renowned reliability